  • A flexible rail fastening superstructure will be constructed along the running tracks, with increased capability to attenuate noise and vibration near sensitive buildings.
  • A glued rail fastening superstructure will be constructed on the operational tracks.
  • In the depot clamp spring rail fastening system with concrete sleepers will be installed on surface tracks, while glued rail fastening superstructure will be provided in car sheds.

In addition, of course, a so called mass spring system with a good environment protection efficiency can also be applied. Finalisation and authorisation of superstructures will be completed following tender design phase, depending on the submitted tenders upon approval of the Transport Authority. Railway superstructure of 1435 mm gauge and welded continuous rails similar to the ones used for existing metro lines will be constructed in the tunnels.


Főoldal A 4-es metró nyomvonala Hírek Milyen lesz a 4-es metró? Hogyan épül? Hogyan működik? Építési napló DBR Metró Projektigazgatóság Akadálymentes metró A budapesti metrók A világ metrói Home Route of Metro4 News What will Metro4 be like? How is it constructed? How does it work? DBR Metro Project Directorate Accessible metro Metros in Budapest Metros around the world Üzemvitel A négy metróvonal összehasonlítása Műszaki leírás Operation Comparison of the four metro lines Technical specifications Üzemvitel Építmények Vasúti pálya Járművek Járműtelep és fenntartási bázis Áramellátás Vasútbiztosító berendezés és automatikus vonatvezetés Mozgólépcsők, felvonók Főszellőzés Tűzvédelem Diszpécser központok Hírközlés és utastájékoztatás Üzemvitel Operation Buildings Track Rolling stock Vehicle Depot and Maintenance Workshop Power Supply Signalling and Automatic Train Control Escalators and Lifts Main Ventilation Fire Protection Dispatcher Centers Telecommunication And Passenger Information System