Keresés    Magyar  Magyar

Back

Share this page:
Facebook Delicious Digg Google Stumble upon

A projekt az Európai Unió támogatásával, a Kohéziós Alap társfinanszírozásával valósul meg.

Traffic limitation on Etele Square


25 january 2007

The section of Névtelen Street between the Volán Bus Terminus and the Hadak Road near Etele Square will be closed for traffic from January 25th en 2007 till July 2007. This is the site of the connecting section of the tunnel with the future depot of the 4th line of the Budapest Metropolitan.

The works will be carried out in two phases. In the second phase the traffic limitations will change again. Between July and October 2007 the Somogyi Road will be closed for traffic for the duration of works to substitute the public utilities and surface works of the connecting tunnel section.