QUICK NEWS
20 april 2010
At Baross Square during the strengthening of the pillar of the Rottenbiller Road overpass one of the subcontractors of BAMCO damaged the wall of one of the metro 2 tunnels during pile boring. These works are part of the preparatory works to the TBM’s passing later. DBR’s responsible engineer is at the site, has suspended works and inspects the scale of the damage. No personal injury occurred, there is no life threatening risk, however the engineer assesses whether the damage can be fixed with maintaining traffic on metro line 2.