Co-00A: Metro line № 2, Baross tér station: structural engineering works of the 2nd exit

December 2004.

 

Co-00B: Metro line № 2, Baross tér station: indoor installation works of the 2nd exit

March 2006.

 

Co-02: Running line tunnels and connected station structures

September 2005.

 

Co-03: Kelenföldi pályaudvar station: structural engineering works

December 2006.

 

Co-04/A: Tétényi út station: structural engineering works

March 2006.

Contractual amendments

 

Co-04/B: Bocskai út station: structural engineering works

March 2006.

Contractual amendments

 

Co-04/C: Móricz Zsigmond körtér station: structural engineering works

March 2006.

 

Co-05/A: Fővám tér station: structural engineering works

July 2006.

 

Co-05/B: Kálvin tér station: structural engineering works

July 2006.

 

Co-06/A: Rákóczi tér station: structural engineering works

September 2006.

 

Co-06/B: Népszínház utca station: structural engineering works

September 2006.

 

Co-06/C: Keleti Railway station: structural engineering works

September 2006.

 

Co-07: Indoor installation works of stations

November 2007.

 

Co-08: Construction of tracks in tunnels and on the surface (in the depot)

November 2008.

 

Co-09: Systems, power supply

July 2006.

 

Co-10: Procurement of metro trains

May 2006.

 

Co-11: Construction of vehicle depot

April 2009.

 

P2: Preparation of conceptual plan and construction licensing plans for 10 stations of the Metro4 line

November 2004. - Palatium Stúdió Építészeti Kft.

 

P3: Drawing up of tender plans, as well as related necessary preparatory tasks

March 2005. - Főmterv Rt. Vezetésével (MottMacDonald Ltd, Uvaterv Rt.)

 

P14: Architectural design of Kelenföld vehicle depot

October 2006. - Dpi design Építőipari és Szolgáltató Kft.

 

K1/A: Planning of related surface investments - Buda stations

August 2007. - Főmterv-Unitef Konzorcium (Főmterv'TT Zrt, Unitef'83 Zrt)

Contractual amendments

Contractual amendments 2.

 

K2A: Execution of related surface investments: Fővám tér-Vámház körút Phase I.

October 2007. - Alterra-Colas-Eger Konzorcium

Contractual amendments

 

K2A: Execution of related surface investments: Fővám tér-Vámház körút Phase II. - additions

October 2007. - Alterra-Colas-Eger Konzorcium

 

K2B: Execution of related surface investments: Kálvin tér-Múzeum krt. Phase I.

October 2007. - Alterra-Colas-Eger Konzorcium

Contractual amendments

 

K2B: Execution of related surface investments: Kálvin tér-Múzeum krt. Phase II. - additions

October 2007. - Alterra-Colas-Eger Konzorcium

 

K2C: Execution of related surface investments: Rákóczi tér

August 2007. - SwO Metro-4 Rákóczi tér Építési Kkt.

 

P6: Managing PR and communication tasks related to the building of the Metro4 line

2005. - Sawyer Miller Group

2009. - Sawyer Miller Group

 

P7: Provision of insurance advisory services

October 2005. - AON Magyarország Kft.

 

P7/2: Provision of insurance services

August 2006. - Allianz Hungária

Contractual amendments

 

P1: System for monitoring karst, subsoil and other ground water

March 2006. - Mélyépterv Kultúrmérnöki Kft.-Mecsekérc Környezetvédelmi Zrt-Soldata SA

 

P10: System for monitoring movement of buildings, noise and vibration

February 2006. - Mélyépterv Kultúrmérnöki Kft.-Mecsekérc Környezetvédelmi Zrt-Soldata SA

Contractual amendments

 

P17: Provision of Project Management Consulting Services

June 2006. - Eurometro Kft.

Contractual amendments - Modification of financial schedule 1.

Contractual amendments - Modification of financial schedule 2.

Contractual amendments - 2010.12.16.

 

P20: Carrying out of expert tasks pertaining to the Project Management arm of the DBR Metro Project Directorate

June 2009. - P20-1 DrSpang GmbH

June 2009. - P20-2 HBI Haerter AG

June 2009. - P20-3 Matrics Consulting

June 2009. - P20-4 MetroConsult

June 2009. - P20-5 Matrics Consulting

June 2009. - P20-6 Matrics Consulting

June 2009. - P20-7 Profil Kft.

 

P8/3: Agency contract for provision of auditing tasks related to the Budapest Metro4 line investment

December 2009.