Co-00A: Metro line № 2, Baross tér station: structural engineering works of the 2nd exit
December 2004.
download |
Co-00B: Metro line № 2, Baross tér station: indoor installation works of the 2nd exit
March 2006.
download |
Co-02: Running line tunnels and connected station structures
September 2005.
download |
Co-03: Kelenföldi pályaudvar station: structural engineering works
December 2006.
download |
Co-04/A: Tétényi út station: structural engineering works
March 2006.
download |
Co-04/B: Bocskai út station: structural engineering works
March 2006.
download |
Co-04/C: Móricz Zsigmond körtér station: structural engineering works
March 2006.
download |
Co-05/A: Fővám tér station: structural engineering works
July 2006.
download |
Co-05/B: Kálvin tér station: structural engineering works
July 2006.
download |
Co-06/A: Rákóczi tér station: structural engineering works
September 2006.
download |
Co-06/B: Népszínház utca station: structural engineering works
September 2006.
download |
Co-06/C: Keleti Railway station: structural engineering works
September 2006.
download |
Co-07: Indoor installation works of stations
November 2007.
download |
Co-08: Construction of tracks in tunnels and on the surface (in the depot)
November 2008.
download |
Co-09: Systems, power supply
July 2006.
download |
Co-10: Procurement of metro trains
May 2006.
download |







